• Türkçe
    • English
  • English 
    • Türkçe
    • English
  • Login
View Item 
  •   DSpace Home
  • Rektörlüğe Bağlı Birimler
  • AKÜ Yayınları
  • AKÜ Dergileri
  • İktisadi ve İdari Bilimler Fakültesi Dergisi
  • 2014
  • Cilt 16 : Sayı 2
  • View Item
  •   DSpace Home
  • Rektörlüğe Bağlı Birimler
  • AKÜ Yayınları
  • AKÜ Dergileri
  • İktisadi ve İdari Bilimler Fakültesi Dergisi
  • 2014
  • Cilt 16 : Sayı 2
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Pozisyon Ağırlığı Metodu ile Tek Model U-Tipi Montaj Hattı Dengeleme

Thumbnail

View/Open

Makale Dosyası (757.6Kb)

Date

2014

Author

Aksoy, Selman
Yıldız, Mehmet Selami
Altınova, Suat

Metadata

Show full item record

Abstract

Montaj hatları, art arda dizilmiş iş istasyonlarının birbirlerine malzeme taşıma sistemi ile bağlanması olarak tanımlanabilir. Montaj hatlarını kullanan işletmelerde meydana gelen en büyük problem atıl zamanların yok edilmesidir. Bu bağlamda ortaya çıkan maliyetlerin minimize edilmesi hatta sıfıra indirilmesi, bununla birlikte üretim kalitesinin arttırılması için montaj hattı dengeleme yöntemleri geliştirilmiştir. Bu çalışmada, güvenlik ve emniyet ekipmanları üreten bir firmada, tek model U tipi montaj hattı dengeleme problemi için sezgisel metotlardan pozisyon ağırlığı metodu kullanılmıştır. Dengeleme çalışması sonucunda hattın istasyon sayısı aynı kalırken, çevrim zamanında iyileşme görülmüştür. Yeni oluşan çevrim zamanı ile hattın etkinliği yeniden hesaplanmıştır. Hesaplama sonucunda hattın etkinliğinde artış görülmüştür.
 
Assembly lines can be defined, as workstations lined up in a row connected with material handling systems. The major problem occurs in enterprises that use assembly lines, is minimizing the idle time. In this sense, in order to minimize the cost or even reduce it to zero, besides to improve the quality of the production, assembly line balancing methods have been developed. In this study, position weight method is used as an intuitive method for single model U type assembly line balancing problem in a company that manufactures safety and security equipments. As a result of balancing work, the number of the stations has remained the same while the cycle time has improved. Efficiency of the line has been calculated again with newly formed cycle time. The calculation results indicate an increase in efficiency level of the line.
 

Source

İktisadi ve İdari Bilimler Fakültesi Dergisi

Volume

16

Issue

2

URI

http://hdl.handle.net/11630/3930

Collections

  • Cilt 16 : Sayı 2 [11]



DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback
Theme by 
@mire NV
 

 




| Instruction | Guide | Contact |

DSpace@AKÜ

by OpenAIRE
Advanced Search

sherpa/romeo

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsTypeLanguageDepartmentCategoryPublisherAccess TypeCitationInstitution AuthorThis CollectionBy Issue DateAuthorsTitlesSubjectsTypeLanguageDepartmentCategoryPublisherAccess TypeCitationInstitution Author

My Account

LoginRegister

Statistics

View Google Analytics Statistics

DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback
Theme by 
@mire NV
 

 


|| Guide|| Instruction || Library || Afyon Kocatepe University || OAI-PMH ||

Afyon Kocatepe University Library, Afyon, Turkey
If you find any errors in content please report us

Creative Commons License
Afyon Kocatepe University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..

DSpace@AKÜ:


DSpace 6.2

tarafından İdeal DSpace hizmetleri çerçevesinde özelleştirilerek kurulmuştur.